Pipe laying and Fiber Optic Work

According to the plan, fibre optic conduits will be laid in trenches, after which our fully equipped fibre optic cable team will lay the fibre optic cables from the
main distribution stations (PoP) via network distribution points (NVT) to the end users (FTTP) and establish all connections. After carrying out the necessary tests, our specialist teams and equipment will provide subscribers with genuine internet access.